OEE-Calculator

Planned Operating Time
12   Hr.
 
0   Min.
Unplanned Stops and Downtime
2   Hr.
 
0   Min.
Actual Operating Time
12   Hr.
 
0   Min.
Maximum Possible Quantity
Total Quantity Produced
Scrap Quantity
Overall Equipment Effectiveness (OEE)
0%
Availability
0%
Performance
0%
Quality
0%

The maximum possible production quantity is per day, corresponding to of the capacity.
This can be achieved within .
The scrap rate amounts to of the total production quantity.

The maximum possible quantity must be between and .

The total produced quantity must be greater than 0 and less than or equal to the maximum possible quantity.

The scrap quantity must be greater than 0 and less than or equal to the total produced quantity.

Amplify Shop Floor Experience –
Get your workers digitally enable

Join our webinar and discover how you can benefit from MES FLEX

Find out more