Production Scheduling: Plan Your Production in Real Time with MES FLEX
Cut lead times by up to 40% and meet delivery dates reliably: the MES FLEX planning board turns real-time data into executable production schedules – and adjusts them as soon as something changes.
A rush order comes in, a machine breaks down, a shift is understaffed: on the shop floor, the plan changes every day. Production scheduling in MES FLEX takes machine availability, employee qualifications and real-world constraints into account. This keeps your production plannable, even when changes come at short notice.
Also available as a standalone Shopfloor App: Schedule4SF
Das leistet die Feinplanung in MES FLEX
-
Import Orders Directly from the ERP System
Orders, key dates, and priorities come directly from the ERP system. There is no need for duplicate data entry.
-
Plan for personnel and machinery realistically
Takes into account your employees' shifts and qualifications, as well as your machines' workstations and operating conditions
-
Automatically Find the Best Order
Automatically calculates the most efficient sequence of operations. This reduces lead times and idle time.
-
Detect Bottlenecks in Real Time
You can view the current production status at any time. You can identify bottlenecks and disruptions early on—rather than waiting until a delivery date is in jeopardy.
-
Adjust plans at any time
In the event of unplanned occurrences, you manually adjust the production schedules and respond immediately to last-minute changes
-
All orders in the control center
The control center displays planned, ongoing, and completed orders at a glance—serving as the central planning and control interface for your manufacturing operations
Your Benefits with Digital Production Scheduling
- Shorter lead times thanks to optimized sequences and less idle time
- Better on-time delivery thanks to realistic schedules and early detection of bottlenecks
- Less planning effort, because routine scheduling runs automatically
- Higher capacity utilization of machines and staff
- Lower inventory levels thanks to demand-driven material planning
- Greater responsiveness to rush orders, breakdowns and material shortages
Frequently Asked Questions About Detailed Planning
What is the difference between high-level planning and detailed planning?
High-level planning determines, on a medium- to long-term basis, what quantities will be produced and by when. Detailed planning implements these specifications in the short term: It determines the sequence, deadlines, and resources for each individual work operation.
What is a control console in production?
A control console is the central planning and control interface for manufacturing. It displays planned, ongoing, and completed orders and allows orders to be assigned to machines and personnel, as well as rescheduled in the event of disruptions.
Where does the detailed scheduling module in MES FLEX get its data?
Orders, key dates, and priorities come from the ERP system. MES FLEX provides the current status of machines and personnel in real time from the production floor.
Can I use detailed scheduling without a full MES?
Yes. With the Schedule4SF shop floor app, detailed scheduling is also available as a standalone solution.
On-Time Delivery Without Daily Rescheduling
Orders, capacity, and priorities stay in sync—even when disruptions or changes occur. Show us your planning situation, and we’ll show you the control center in MES FLEX.
Practical Knowledge on Detailed Planning
Technical articles, webinars, and success stories on production planning, control centers, and on-time delivery with MES FLEX.
Keine Inhalte gefunden.